Transparent, and complete set of permitting documents are attained.
Acquired projects should have minimal variance to the assumption case for all acquisitions of de-risked operational projects.
Projects should be constructed and awaiting electrification or be operational. They should be in a cluster or aggregate of more than 5 MWp each.
All projects must have a Feed-in Tariff (FIT) of at least €60/MWh (or €0.06/kWh).
Projects should have annual irradiation of at least 1,500 kWh/kWp to 1,600 kWh/kWp (Greece).
Projects should be installed with Tier-1 hardware.
We collaborate closely with landowners to understand their long-term goals and develop solar projects that provide benefits for both them and the surrounding community.
Our dedicated and diverse team of in-house specialists identifies suitable locations, conducts early feasibility studies—including market research and policy evaluation—and design medium to large-scale solar developments.
Our process includes:
Upon receiving planning approval, the project moves forward to procurement, engineering, and ultimately, construction.